850E9CF1BDB427A449BB939C212464A9DE641730
The NSSS has a reserve capability of returning to full power at the design ramp rate at any time during the reference daily load cycle through at least 85 percent of the equilibrium fuel cycle (i.e., minimum burnup of 11,000 megawatt days per metric ton of uranium).